Automation & Control
Lighting, shades, climate, access and entertainment brought into one Control4 environment, designed in from the plans.
Pacific Palisades · Fire Rebuild Program
Tech In Control is actively taking on Pacific Palisades rebuild projects — whole-home automation, security, networking and audio/video, planned into your framing and rough-in schedule rather than retrofitted later. C7 licensed. Control4 certified. Ready now.
1,400+
Rebuild permits issued in Pacific Palisades
340+
Homes currently under active construction
1
Window to pre-wire cleanly — before drywall
Why This Matters Now
Structured cabling, security wiring and Control4 infrastructure have to be planned and run at framing — before insulation and drywall close the opportunity. Homes rebuilding right now are moving through that window month by month. Getting it right the first time means no cut walls, no exposed conduit, no compromise later.
Lighting, shades, climate, access and entertainment brought into one Control4 environment, designed in from the plans.
Wired surveillance, recording, intercoms and controlled entry — a rebuild is the moment to get coverage right from day one.
Structured cabling and enterprise-grade Wi-Fi built into the walls, not bolted on afterward.
Home theater, whole-property audio and concealed displays, coordinated with the architecture from the start.
We coordinate rough-in directly with your framing and electrical timeline — no gaps, no delays to your GC's schedule.
Who We Work With
Homeowners
We'll walk your plans, tell you honestly what to lock in before drywall, and give you a clear scope and budget — no pressure, no vague numbers.
General Contractors
Add Tech In Control to your bid list for Palisades rebuilds. We coordinate directly with your site super and show up on schedule — no babysitting required.
Architects & Designers
We'll work from your construction documents to plan rack locations, conduit runs and panel placement before the framing crew shows up.
Recent Pacific Palisades Work
Control4 system installation, Pacific Palisades
Control4 lighting control, Pacific Palisades
Pre-wiring for landscape audio, Pacific PalisadesPre-wire needs to happen at framing, before insulation and drywall close the walls. This is the only point where structured cabling, security wiring and Control4 infrastructure can be run cleanly and cost-effectively — retrofitting after drywall is significantly more expensive and invasive.
Yes. We regularly work as a low-voltage subcontractor alongside general contractors and architects on Pacific Palisades rebuilds, coordinating our rough-in schedule directly with the framing and electrical timeline.
Yes. Tech In Control holds a California C-7 low voltage license (#981868) and is a Control4 Certified Dealer, with experience across Bel Air, Beverly Hills, Brentwood, Malibu and Pacific Palisades estate properties.
Whole-home automation and lighting control, structured cabling and enterprise-grade Wi-Fi, security cameras and access control, landscape and outdoor audio, motorized shades, and home theater or distributed audio/video — all planned as one coordinated infrastructure rather than added piecemeal after move-in.
We are actively taking on Pacific Palisades rebuild projects now. Call (818) 510-0077 or submit a project inquiry — we can typically schedule an initial site or plan review within days, which matters most for homes approaching framing or rough-in.
Begin a Conversation
Whether you're a homeowner planning ahead, a GC looking for a low-voltage sub, or an architect specifying infrastructure — reach out directly. Visit the contact page or call (818) 510-0077 directly.
Also Serving